Sonnedix Japan
2015
Inicio de Operaciones
494.8 MW
MW capacidad operativa
25
Proyectos
106.7 MW
Pipeline de Desarrollo
Oficinas:
6th Floor, Ryuen Building, 1-3-1 Shiba Koen, Minato-ku, Tokyo 105-0011
*Sonnedix Japan is the trusted operator for investments made by Sonnedix in Japan.